h无码在线观看,夜色色综合网,日韩AV免费久久,蜜臀久久综合视频

Language:CHINESESENGLISH

Home > News > Steel structure warehouse hoisting process and hoisting plan-Chapter 1
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.linbaoquan.cn

Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:3052

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
97爱在线视频| 日韩中文无码AV同性| 大香蕉视频在线视频一区二区三区| 少妇性爱精品久久| 日本京东热视频一区二区三区免费看| 精品啪啪啪啪啪| 971午夜精品福利| 国产精品 制服美女| 五月婷婷麻豆| 欧美大鸡巴拔萝卜国产网站| 女同欧美成人视频在线免费| 免费一区二区不卡高清av| 三级斤a久久久| 伊人天天操影院| 美乳大鸡巴网页| 婷婷噜噜噜色色| 国产免费香蕉久久九九精品视频| 国产精品综合麻豆视频在线观看| 欧美日韩色情精品在线免费观看| av一区二区黄色视屏| 88国产精品综合久久| 超碰黄色av| 色五月婷婷五月天AV| 国产一啪二啪三啪视频| 国产日韩一区无码| 一区二区人| 麻豆一区二区在线首页观看 | 色情aⅴ一区二区三区| 精品丝袜美腿老师一二三区| 欧美人畜在线| 中文AV秘 无码在线观看| 全球色色色干哟哟| 久久少妇高潮99| 一区二区四区六区操B片| 亚洲国产成人视频精品一线二线| 欧美大香蕉2| 91成人网站精品| 步兵资源一区二区| 先锋av资源| 国产高清v片| 在线欧美不卡|