h无码在线观看,夜色色综合网,日韩AV免费久久,蜜臀久久综合视频

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.linbaoquan.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2958

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
www.av电影天堂| 欧美日韩91p| 自拍 偷拍欧美日| 男人天堂东京热av一区二区三区 | 久久嫩草影院最新网址| 蜜臀国产在线观看| 日本精品X区| 九九色成人精品| 亚洲区 偷拍| 曰韩一欧美一国产www| 在线观看嗯嗯啊啊啊啊啊视频| 黄色亚洲免费| 99热出轨人妻| 亚洲 图片 日韩 欧美| 91色嚕嚕| 日本骚妇被操| 杭锦后旗| 日本免费在线有码不卡| 久久久久久级毛片视频| potn国产精品| 久69久久69久久久69| 日本在线视频不卡二三区| 高清无码一区二区本地| 亚洲老女人性爱视频| 骚逼人妻系列片骚| 久久久久九一区| 美女免费日B视频| AV世界男人天堂| 美女理伦一区| 又粗又长又猛A网视频| 珊珊野战少妇久久久久久久| 老熟女久久久国产乱子伦精品免费 | 日韩毛片大尺度| 金品无码②| 中日韩欧美在线| 中文字幕亚洲乱码熟女1区2区| 久操青青在线| 婷婷久久社区| WW久久精品视频| 日韩精品久久入口| 日韩少妇加勒比内射|