h无码在线观看,夜色色综合网,日韩AV免费久久,蜜臀久久综合视频

Language:CHINESESENGLISH

Home > News > Problems needing attention in the process of steel structure construction
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.linbaoquan.cn

Problems needing attention in the process of steel structure construction

Time:[2022-8-29]  Hits:2429

The steel structure construction project has become more and more popular in recent years, and the problems to be paid attention to in the construction process are particularly important. Generally, many safety problems can be avoided only by the following points. Next, I'll talk to you.

 

First, the size of reinforcement holes shall be reserved before and after construction


In particular, the holes on the section steel can be as small as possible, so that the steel can have good strength. In addition, the loss of profile steel shall be reduced to facilitate construction. In addition, when drilling the steel structure, the two symmetrical sides of the reinforcement shall be taken into account. It is particularly noted that the edge of the reinforcement with a diameter greater than 25mm may increase the diameter of the reinforcement by 1 ~ 2mm.


Second, the position of reinforcement holes must be reserved in advance


When drilling, the upper, lower, left and right positions shall be aligned accurately, otherwise it will be very difficult to pass through the reinforcement. If the information of the construction party responsible for the construction of section steel is inconsistent with that of the civil construction party in the practice of steel structure construction, the two parties need to communicate in time during the construction process.


Third, installation details of bottom steel column


If the embedded steel column at the bottom is light, we can use machinery for lifting, and manual position calibration can be done. This has many advantages.


First, the accuracy of the mounting position can be ensured; Second, because the component processing plant has completed the foundation fabrication of the steel column, the center of the profiled steel column and the center of the base plate must be coincident during fabrication, so the corresponding outer contour is parallel; Third, use the tower crane or other auxiliary installation machinery to lift the foundation embedded column, and then slowly lower the foundation embedded column. In this way, the four corners of the column base plate are aligned with the contour line, and the base plate of the column base is on the mat. Striking while the iron is hot will save time and labor, and can greatly improve the progress of the steel structure construction.


In addition, we can calibrate the position of the foundation embedded column with the help of two theodolites. Then fix the two theodolites on the vertical and horizontal axes of the column, and then move the position of the column to make the front center line of the column coincide with the viewpoint of the two theodolites, which can ensure the verticality of the column.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
av美女在线观看| 美日韩精品在线危费看| 妞干网唯一大吊熟女| 国产一区二区pron| 日韩情色欧美一区二区| 精东在线欧美日韩| 亚洲午夜成人悠悠电影院| 大鸡吧综合| 在线视频 一区 中文字幕| 亚洲日本久久一区二区va| 日韩一区成人网| 一级小黄片视频| 欧美一区三区免费| 人人操人人擦| 亚洲超碰一区欧美| 久久福利视频网| 亚洲一区二区观看不卡| 五月天成人无码高清| 日本精品一區二區| 91在线粉嫩视频| 殴美精品AAA| 国产精品2018| 噜噜亚洲色| 超碰这里只有精品久久| 超碰97大香蕉人人| 91白色国产| 欧美午夜日韩色欲| 人妻无码一区二区精品免费蜜臀| 久久香蕉成人免费影片| 在线日韩伦理在线| 免费毛片一区二区二区| 久久久久999婷婷| 91.不卡视频| 爽爽爽爽爽成人网站| 白丝美女被狂操出水免费app| 日美女草逼| 高清一区二区无码小说| 91久久精品亚洲日韩| 国产精品视频97av| 日韩精品少妇大奶| 天堂电影中文8麻豆|