Preparation for steel structure installation of prefab industrial buildings

Time:[2022-3-14]  Hits:2726

With the continuous development of economy, diversified architectural structures have entered our daily life. Develop prefabricated buildings such as prefabricated concrete structure, steel structure and modern wood structure according to local conditions. Steel structure prefabricated buildings are widely used in different types of fields such as industry, commerce, agriculture and so on. The fast installation method is conducive to the rapid completion of the industry and get a good development trend.

The contents and requirements of steel structure installation preparation of prefab industrial buildings are the same as those of ordinary steel structure installation works. During the construction of steel column foundation, the positioning and protection of anchor bolts shall be done well, and the top elevation of foundation and anchor bolts shall be controlled. After foundation construction, inspection and acceptance shall be carried out according to the following contents:

(1) Whether the axis position of each row and column is correct;

(2) Whether the span of each span meets the design requirements;

(3) Whether the elevation of foundation top meets the design requirements;

(4) Whether the position and elevation of anchor bolts meet the design and specification requirements.

Before the hoisting of components, the shape and section geometric dimensions of components shall be inspected according to the relevant provisions in the <<Code for construction and acceptance of steel structure engineering>> and the deviation shall not exceed the value specified in the specification; The components shall be numbered according to the requirements of the design drawings, highlighting the installation center mark. The center mark and elevation mark in two directions shall be popped up for the steel column; Mark the position of binding point; The length of the column should be measured, and the length error should be recorded in detail. It should be written on the plane beside the center mark of the lower part of the column with oil pen, so that it can be adjusted in the two grouting layer of the top elevation of the foundation.

Components entering the construction site must have quality assurance and detailed acceptance records; It shall be stacked in the designated area according to the type, model and installation sequence of components. Enough supporting surface shall be provided for the component stratum skid to prevent the fulcrum from sinking; When components of the same model are stacked, the fulcrum of each layer of components shall be on the same straight line; The deformed components shall be corrected in time and can be installed only after passing the inspection.

Following the contents of the specification, the construction party effectively prepares for installation and provides favorable conditions for the installation of the main steel structure of the prefab industrial buildings. For the construction of steel column foundation, implement the work details and do the work well, which is more conducive to the later installation of steel structure. The normal use of prefab industrial buildings is closely related to the installation preparation. Relevant construction party shall make preparations for the installation of prefab industrial buildings.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
激情综合网五月| 日韩一区二区三区四区日B小视频| 九九热这里有一区二区| 嗯嗯嗯啊嗯啊好大在线| 中文字幕av成人社区| 日韩欧美一卡成人在线观看| 中文天堂在线无码| 麻豆传媒三级片电影| 国产又长又大又粗| 亚洲精品 未广纯| 激情久久精品伊人一区二区| 久久久久久久久久久国产精品| 亚洲欧洲日本韩国精品一区二区三区 | 在线视频,日韩| 拷问人妻无码一区| 欧美最爽的乱淫视频| www.777.一区二区三区| 麻豆一区二正| 日韩丰满熟妇人妻无码视频| 亚洲伊人大香蕉久久| 国产插少妇菊花的视频五区| 91国产精品成人视频| 色五月大香蕉婷婷| 鸡巴插逼免费视频。| 综合激情 一区| 精品视频在线天天干| 香蕉亚洲熟女韩国| 久久一区二区三区图片| 粉嫩在线一区二区三区观看视频| 日本精品日日骚| 国产区aa枫花恋| 自拍偷拍 第一图区| 色大师AV灬| 日本少妇久九| 国产骚笔91| 裸体美女自拍偷拍| 91精品99| 亚洲成人码| 欧美一级搞逼| 日本欧美一二| 制服丝袜电影网站污|